Research
Key figures, the studies behind this site, and the milestones so far.
Key figures
- 50%of winter electricity costs covered for greenhouses with green heating, from November 2026
- 4–6×projected geothermal resources compared with hydrocarbons, to 5–6 km
- 68–70 °Cwater from the Altynsai wells, already used by two sanatoriums
- 100 MWbinary-cycle power plant proposed for the Gissar region
- 10,000 m³of gas saved a year by a Khorezm polyclinic’s heat pump
- ~98%of 2021 electricity use that 1% of superhot rock could supply, by one model
Studies
- Heat flow of Uzbekistan: geology and interpretation
- Geothermal research in Uzbekistan
- Development of the renewable geothermal energy in Uzbekistan (as an example – the Muruntau area)
- The state and prospects of geothermal energy development in Uzbekistan
- Superhot Rock Geothermal in Uzbekistan: regional assessment
- Scaling-up renewable geothermal energy in Uzbekistan (as an example – the Gulistan area, Gissar region)
- Thermal energy resources of geothermal waters of Uzbekistan and prospects of their utilization
Timeline
May 2017
A presidential programme for renewable energy and energy efficiency sets out plans for 2017–2021. YuzNews
May 2019
The Law “On the Use of Renewable Energy Sources” introduces incentives for renewables. YuzNews
July 2019
A Finnish company looks at geothermal opportunities in Uzbekistan. ThinkGeoEnergy
2019–2021
The Institute of Geology and Geophysics maps heat flow nationwide and surveys Muruntau, Krasnogorsk and Bayangora. Story
October 2023
A World Bank workshop in Tashkent introduces a sustainable heating roadmap and the heat pump market. ESMAP
July 2023
A paper sets out a method for detailing geothermal anomalies, tested at Muruntau. Story
February 2024
A national review puts projected geothermal resources at four to six times those of hydrocarbons. Story
March 2024
France’s BRGM signs a cooperation memorandum with Uzbekistan that includes geothermal energy. Story
May 2025
A polyclinic in Khorezm switches from gas to a geothermal heat pump. Story
June 2025
A superhot rock assessment models Uzbekistan’s deepest heat. Story
September 2025
The IGA and Uzbekneftegaz agree to form a joint working group to draft a geothermal roadmap. Story
September 2025
Uzbekgeofizika opens a geothermal line of work, starting with well No. 1 in Kokand. Story
October 2025
Uzbekgeofizika begins a feasibility study for a pilot using heat from deep wells. Story
November 2025
Uzbek energy institutions study geothermal district heating in France, with BRGM and CFG. Story
December 2025
BRGM and the University of Geological Sciences agree on research and training. Story
February 2026
Uzbekistan holds its first International Geothermal Forum, on the IGA’s initiative; pilot projects are agreed. Story
September 2026
French and Uzbek geologists start studying the Fergana Valley’s geothermal potential. Story
October 2026
A presidential resolution covers half the winter electricity bill for greenhouses heated by heat pumps, geothermal or other green systems. Story